| Energy
Energy efficiency of a building relies equally
on the design and on its operation. The best buildings tend to match
demand and supply through careful performance monitoring, attention
to user’s complaints, and well designed diagnostic systems. A tenant
operation manual should be developed based on the recommendations
in the Department of Energy, Utilities and Sustainability (DEUS)
Tenant energy handbook. Occupant complaints should be investigated
with a high level of communication and follow up to develop and
ensure a satisfactory solution. Efficient handling of occupant complaints
has been shown by UK Probe studies to have a significant impact
on the productivity of staff.
The Australian Building Greenhouse Rating (ABGR)
Scheme is a national benchmark program for measuring the greenhouse
performance of commercial buildings based on the energy consumption.
The rating goes from a scale of 1 to 5, the more stars that the
building receives the better the greenhouse performance.
DEUS operates the ABGR scheme in NSW it consists
of three possible ratings:
- Base Building ABGR Rating – this
incorporates energy consumed by the building’s services including
lifts, external lighting, car park ventilation.
- Tenancy ABGR Rating – this is based on the
tenants’ energy consumption, including lighting, equipment and
supplementary cooling.
- Whole Building ABGR Rating – is a combination
of the tenancy and the base.
Government policy relating to required ABGR ratings
for base buildings and tenancies is detailed in Premier's Memorandum
2004-04, greenhouse Performance of Government Office Buildings and
Rental Properties. The Memorandum states that:
Where an existing building is owned by the agnecy,
the agency must
- Achieve a 3-star building rating
by 1 July 2006 and
- Commit to a minimum 4 star rating
when undertaking major upgrades.
Agencies that build new
government offices are to commit to a 4.5 star rating for the new
building.
Where an agency is a tenant, the agency must
- Achieve a mimimum 4-start tenancy
rating by 1 July 2006
- Commit to a 4.5 star tenancy rating for major
fit outs and refurbishments
- Endeavour to occupy premises where the building
is rated at least 3 stars (this will increase to 3.5 stars from
1 July 2006) and
- Require disclosure of the accredited rating
for the building when seeking information about the building for
leasing purposes.
A full description of the policy is attached to
Premier's
Memorandum 2004-04 and is available from the Premier's
Department website.
ABGR Base Building:
Ensure that the ABGR rating complies with policy
in PM2004-04. An ABGR
accredited assessor should certify all ABGR ratings. The following
categories are a guideline to energy performance within a building:
- Building Orientation/Massing
- Façade Performance
- Commissioning/Operation
- Measurement and Verification
- Air Conditioning System
ABGR Tenancy:
Ensure that the ABGR complies with guidelines
established. An ABGR accredited assessor should certify all ABGR.
The following categories are a guideline to energy performance within
a building:
- Lighting System/Control
- Equipment
Whole Building ABGR:
Ensure that the ABGR complies with the policy
detailed in Premier's Memorandum 2004-04. An ABGR accredited assessor
should certify all ABGR. The following categories are a guideline
to energy performance within a building:
- Base Building ABGR
- Tenancy ABGR
- Renewable Energy
- Purchase of Green Power
Base Building ABGR
Click
here to see larger Diagram
Building Orientation/Massing
The most cost effective method of developing May
energy efficient buildings are to develop a coherent effective building
massing, orientation and space planning strategy. The following
issues should be considered when selecting a building:
- Orientate building within
20 degrees of North. Avoid façades facing North East or North
West. Consider massing circulation
and lift areas on the West and limit windows facing West.
- Daylight potential is related to gaining access
to a view of the sky dome. Ensure that potential building line
has less than a 30 degree cutoff to surrounding features. Aim
at floor plates 5 times the floor to floor height wide for access
to daylight for side light schemes. Consider using atriums and
light wells for sites that need wider floor plates.
- Space planning of buffer spaces that
are used seasonally, for circulation or at different times of
the day needs to be considered. Buffer spaces modify façade loads
on West and East orientations that are difficult to shade however
may be uncomfortable at different times of the day. North
and South facing areas vary in comfort at different times of the
year. These spaces may be used effectively for break out space
to offices or circulation space if the nature of occupancy is
known. For example East and West facing meeting rooms may be used
effectively at different time’s of the day.
- Areas in the building that are to be naturally
ventilated need to be located adjacent to external areas that
have good air quality and acoustics.
- Circulation zones should be planned in areas
that are more climatically variable such as atriums and external
walls.
Façade Design and Performance
Glass Flues give “External” Shading and selective solar heat removal:
One of the largest energy loads in a building
is due to envelope gains and losses. Limiting these loads will improve
energy performance and improve occupant comfort. This applies primarily
to air conditioned spaces however is also relevant to naturally
ventilated spaces.
A target level of 70 W/m2 peak summer façade heat
gain is recommended for air- conditioned spaces. This value is not
relevant for naturally ventilated space however due to the need
to limit external loads to achieve comfort in natural ventilated
spaces this target may still apply. In addition an occupant comfort
rating should not exceed 20% PPD adjacent to the facade.
A target level of winter peak heat loss is 50
W/m2.
There are several strategies to minimise the adverse
effects of the exterior environment. These strategies insulate the
occupied space from extreme temperatures and shade the space from
solar gains as needed. At the same time, however, these systems
will need to be easily maintained. Optimising the size and distribution
of glazing for orientation, view and daylight is one of the most
significant forms of improving occupant comfort and energy efficiency.
Reducing the size and quantity of west facing glazing should be
given a priority. North East and North West façades should be considered
along the same lines. The size of window should be optimised considering
all the following issues to develop an effective shading coefficient
and the possible benefits of low angle solar heating in winter months.
Shading should be used to protect the façade from
solar energy lowers cooling loads. Shading also helps control glare
and thermal discomfort that occupants may experience due to high
solar gains. The most effective shading devices will vary with latitude
and orientation as the sun's position and intensity changes with
time of year and time of day.
To ensure energy targets are being maintained
the tenants operation manual should provide guidance on the following:
- Ensure that façade is maintained
as described in the maintenance manual.
- Replacement or modifications of the façade
if required will consider the implications on the building as
a whole.
- Operable façade systems shall be commissioned
on completion of the construction and re-examined at end of liquidations
period.
- Ensure thermal mass used in building, as part
of passive design strategy is not covered up or otherwise altered
to negate its effects.
Heating,
Ventilating, and Air-Conditioning (HVAC)/Commissioning
The air conditioning running and operating costs
contribute significantly to the energy demands on the building.
Ensuring that the correct air conditioning system for the space
has been installed can significantly reduce the energy output from
the building.
Design criteria for office staff, large gains
within the space (continuous occupancy and equipment loads), natural
ventilation alone may not maintain thermal comfort conditions during
summer months, therefore an air conditioning system will be applied.
The system used should be one of the following, Variable-Air-Volume
(VAV) system, displacement system or chilled ceilings, however,
each of the systems may be better suited to various applications.
For meeting rooms, council chambers etc where
the noise level is important, air conditioning should be used during
occupancy; a VAV system would be recommended. The VAV system will
react to the varying occupancy within the space when occupied and
also shut down when unoccupied. For areas where there is a large
volume of space, for example an auditorium, the displacement system
would be recommended, the cooling capacity of a displacement system
is increased with increase in height within the space. A combination
of chilled ceiling and displacement systems should be investigated
in administration. Removing part of the heat load through chilled
water would reduce the requirement for air. Therefore only the minimum
fresh air would be supplied resulting in reduction in running costs
and reduction in plant size and improved indoor air quality.
The design criteria for an area of interaction
(a mix of outside and administration) more flexibility should be
allowed. In general, these areas natural ventilation should be used
with spot heating and cooling applied where necessary.
It is also critical that the HVAC system is maintained.
Verify and ensure that fundamental building elements and systems
are designed, installed and calibrated to operate as intended. The
building supervisor should use the operation manual with particular
emphasis on the following:
- Adjust hours of operation of
HVAC systems to levels appropriate to time of year, type of use
and nature of occupancy.
- Use appropriate adjusted timing devices on
exhaust systems and ensure CO2 sensors are working appropriately.
- Use BMS to operate HVAC systems based on need
and avoid simultaneously providing heating and cooling by ensuring
a deadband of at leat 2°C is maintained on all thermostats.
- Maintain boiler and chiller efficiency. Efficiencies
shall be dependant on model/type of boiler. Typically, however,
these should be:
- Boiler: 80% efficient at maximum capacity
- Water Cooled Chiller: 5.6 COP at maximum capacity
- Air Cooled Chiller: 2.5 COP at maximum capacity
- Repair any duct and pipe leaks, the following
monthly checks and repair is recommended:
- Check joints in ductwork for air leakage.
- Check joints in pipework for water leakage.
- Replace air filters as specified in the maintenance
manual.
- Rebalance pipe and duct systems every 2 years.
- Establish measurable guidelines for variables
such as outdoor air flow, temperature, humidity, and filtration
efficiency and monitor their performance.
Consider additional improvements to energy efficiency:
- High-efficiency motors are suggested
for all applications because of their energy saving capabilities,
longer life, and reduced maintenance costs. Motors should be of
the proper size to avoid the inefficiencies of oversized equipment.
- Variable-speed drives have advanced significantly
over recent years. They offer a proven means of substantially
reducing the energy used by fans, chillers, and pumps under part-load
conditions. Electronic drives are considered the best option;
drive controller and motor selection are also important considerations.
- Mechanical drive efficiency can be improved
to reduce losses in the power transmitted from a motor to the
motor-driven equipment. Consider direct-drive equipment options
and review actual loss factors on belt- or gear-driven equipment.
- Direct Digital Control (DDC) systems offer
greater accuracy, flexibility, and operator interface than pneumatic
systems. Use sensors that have the greatest accuracy to improve
energy efficiency and performance.
- Advanced control strategies using DDC systems
include system optimisation, dynamic system control, integrated
lighting and HVAC control, and VAV box airflow tracking.
Measurement and Verification
Ensure that there is ongoing accountability and
optimisation of building energy and water consumption performance
over time. Some of the following approaches should be considered:
- Use one time power measurements
combined with short to medium term current measurements, seasonal
or annual power usage can be estimated for a particular piece
of equipment or end use.
- Consider submetering of energy of electrical
distribution system, seperating tenancy and base building loads.
- Does submetering address the need to monitor
particular operational risk areas, such as reheats?
- Does the building management system monitor
the energy, does it allow examination on short term basis?
Air Conditioning
Refer to section Heating,
Ventilating, and Air-Conditioning (HVAC)
Tenancy ABGR
Click
here to see larger Diagram
Ensure that the ABGR rating complies with guidelines
established by Department of Commerce.
An ABGR accredited assessor should certify all ABGR ratings. The
following categories are a guideline to energy performance within
a building:
Lighting
One of the major consumers of electricity within
a building is the lighting systems.
The introduction of natural daylight can reduce
the need for artificial lighting and increase the connection occupants
have with the outside. Lowering the artificial lighting loads also
lowers cooling loads and thus increases the benefits of passive
ventilation and cooling.
As daylight is highly variable, it should be used
primarily for ambient lighting. Ambient light levels should be targeted
at 320Lux for offices and 250Lux for classroom spaces.
The real benefit of an effective daylighting system
is that it redistributes the light in the space so that a better
uniformity throughout the space is achieved. A suitably designed
light shelf can control glare near the perimeter and daylight spaces
located 6-7m from the perimeter. The flexibility of such systems
needs to be considered in office layout and partitioning.
Other spaces may or may not be effectively daylit
depending on the use, the light levels required and the sensitivity
to glare. Where this is the case artificial lighting will be required.
The use of high efficiency luminaries and appropriate switching
systems to turn lights off will ensure that energy savings associated
with lighting will be reduced. Minimise the number of lights controlled
from a single switch so that only areas that are occupied have lighting
turned on.
Circulation areas and the general office space
may be designed to have a background illumination whilst task lighting
is provided in work areas where tasks require particular lighting
levels. A target average lighting load of 8.5W/m2 is recommended
as a minimum. As a minimum daylit areas should have daylight linked
luminaries. The following should be considered for installation
of energy efficient lighting:
- Compact fluorescent task lighting
gives occupants flexibility in tailoring the lighting to their
needs.
- Consider sensor in car park lighting and introducing
daylight to car parks.
High efficiency systems with flicker free electronic
ballasts are reliable, the savings in energy and maintenance costs
provide a good return on investment:
- Avoid using dichroic incandescent
lights (halogen).
These systems may easily be modified and altered
during the life of the building thus the tenant operations manual
should consider the following issues:
- Reduce illumination to levels
most suitable to work, subject to OH&S.
- Clean and maintain lenses reflectors and lamps.
- As a minimum install time based switching controls
to turn lights off at night.
- Ensure dimming and switching controls are appropriate.
- adjusted for time of year and nature of occupancy.
- Upgrade to efficient lighting systems when
they become cost effective.
User Equipment
Office equipment can be a major contributor to
the energy load on a building. Office equipment can consist of computers,
printers, faxes etc. Some of the following approaches should be
considered when reviewing the equipment load:
- Energy efficient equipment such
as LCD screens which can half the energy consumption compared
to a equivalent CRT screen and printers, photocopiers and the
like with automatic ‘power save’ functions.
- Company policies and management strategies
to switch off all equipment at night.
- Activate energy options on computer equipment.
Whole Building ABGR
Ensure that the ABGR complies with guidelines
established by Department of Commerce.
All ABGR should be certified by an ABGR accredited accessor. The
following categories are a guideline to energy performance within
a building:
- Base Building ABGR
- Tenancy ABGR
- Renewable Energy
- Purchase of Green Power
Base Building ABGR
Refer above.
Tenancy ABGR
Refer above.
Renewable Energy
Encourage and recognise increasing levels of self-supply
through renewable technologies to reduce environmental impacts associated
with fossil fuel energy use.
Investigate funding opportunities (Greenhouse
Gas Abatement Program (GGAP), Renewable Commercialisation program,
utility providers etc) Some of the following issues should be considered
when assessing renewable energy:
- Local utilities need to be able to buy the
power back? Consider using it directly in UPS Consider leasing
- Consider maintenance
Options that may be cost effective are as follows:
- PV’s installed to cover base
building lighting (switched scheme including car parking)
- PV’s installed to cover 30% of building load
- Solar or heat recovery pre-heat for DHW
- Solar thermal for DHW and electricity
Adapting the building to new fuel source or installing
photovoltaic require only minor adjustments to architectural, HVAC
or electrical systems.
Purchase of Green Power
Encourage the development and use of grid-source
energy technologies on a net zero pollution basis.
|